Skip to content
kavolu
All destinations from Maastricht

Maastricht → Leverkusen

No direct departure on Thu, December 17, 2026Direct, no changes

Plan the journey

Timetable runs to March 27, 2027

Next dates

No direct connection runs between Maastricht and Leverkusen on Thu, December 17, 2026.

The next date is Fri, December 18, 2026.

Maastricht → Leverkusen at a glance

Direct coaches from Maastricht to Leverkusen run once daily. The ride takes 3 h. It always leaves at 05:00. Every departure is between 10 pm and 6 am. In Maastricht, it leaves from the stop “Maastricht (International Bus Station)”. All rides are run by FlixBus. Direct coaches back from Leverkusen to Maastricht run once daily.

Timetable valid September 27, 2026 to March 27, 2027. Source: open GTFS timetable by BlaBlaCar Bus, FlixMobility Tech GmbH.

kavolu shows no prices. The price is checked with the operator on click.